KOMAREK machines are custom-designed for each application and material handling needs.
Machine delivery is typically three to nine months, depending on the amount of time needed during each of the following phases:
- Discovery: Discussion of materials and characteristics, throughput requirements and desired end product.
- Engineering/Concepting: Determination of appropriate size machine, rolls and other machine specifications.
- Laboratory Test Production: A sample test of materials to be briquetted or compacted/granulated is scheduled and run on our laboratory roller press and/or a test production completed at our full-scale Research & Test Facility.
- Approval: Final sign-off on all machine specs.
- Final Manufacturing: Machine is manufactured in our U.S. plant.